逍遥法外电影大尺度未删减,伊人天堂网,蜜桃臀av在线,综合网天天,老炮儿电影未删减完整版下载,国内久久精品视频,风花电影在线观看完整版

 
 

Home/News

CEEC: No.2 unit of Warora Project runs up successfully

Updated: 2013-08-05

On Aug 5 (local time), the No.2 unit of Warora 2*300MW project, which was undertaken by CEEC, was successfully set to a constant speed of 3,000 RPM, with satisfactory main technical indicators such as turbine vibration and bushing temperature, etc.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.