逍遥法外电影大尺度未删减,伊人天堂网,蜜桃臀av在线,综合网天天,老炮儿电影未删减完整版下载,国内久久精品视频,风花电影在线观看完整版

 
 

Home/News

No.1 branch tunnel of the water diversion tunnel of Sopladora Hydropower Station finished

Updated: 2012-06-25

Lately, the No.1 branch tunnel of the water diversion tunnel of Sopladora Hydropower Station has been finished in Ecuador, with the supporting system completed two days ahead of schedule.

The No.1 branch tunnel extends 335.95 meters. The project department, despite the complicated geological conditions, high safety risks, great construction difficulties, tight schedule and the communication problem with foreign staff, made concerted efforts and a careful plan, optimized the construction design, and completed the project two days ahead of schedule, laying an essential foundation for the excavation of the water diversion tunnel.

The 4.7km-long water diversion tunnel is under excavation in a well-organized fashion.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.