逍遥法外电影大尺度未删减,伊人天堂网,蜜桃臀av在线,综合网天天,老炮儿电影未删减完整版下载,国内久久精品视频,风花电影在线观看完整版

 
Home> Local

Outbound service building roofed

By Liu Yufen ( chinadaily.com.cn )

Updated: 2013-10-18

  Print Mail Large Medium  Small 0

The outbound service building of Pingtan Strait Bridge's second line was roofed on Oct 15. The project will move onto other steps including a curtain wall fa?ade.

As only one channel linked Pingtan and the mainland, the second line of Pingtan Strait Bridge is crucial and will increase customs supervision over goods and passengers. It will be the main passageway after the establishment of the Jinjingwan Customs Clearance Center.

The second line is a special supervision area without frontier inspection. The inspection for the passengers and goods out of Pingtan is obligatory while the inspection for passengers and goods entering Pingtan is voluntary.

The second line of Pingtan Strait Bridge covers an area of 161,000 square meters with a total building area of 21,000 square meters that includes an inbound service building, an outbound service building, 20 inspection passages, 40 inspection stations as well as 207 parking lots.

Edited by Chen Zhilin and Niva Whyman